Special pump factory professional sharing: asphalt insulation pump installation notes and timely process analysis

The asphalt insulation pump and the asphalt insulation pump we usually use can basically be used in the same situation, and can completely replace the asphalt pump. There are five things to note when installing an asphalt insulation pump:

1. When installing the asphalt heat preservation pump, it should be noted that the arrow on the valve body should be consistent with the flow direction of the medium.

2 , asphalt insulation pump should ensure that the power supply voltage is within 15%-10% fluctuation range of the rated voltage .

3. The asphalt insulation pump should thoroughly clean the pipeline before installation. The medium that is introduced into the pipe is guaranteed to be free of impurities. A filter should be installed in front of the valve.

4, the pitch heat pump installation, the pipeline can not reverse pressure.

5. When the asphalt insulation pump fails or is cleaned, a bypass device should be installed to ensure the system continues to operate.

The aging of the asphalt pump depends on the choice of the process of vibration aging. The process of vibration aging is complicated, and the process analysis of the box parts must be carried out before the vibration, and the vibration parameters should be optimized to improve the vibration aging effect. According to the material and structure of the workpiece, the process form and process of the blank manufacturing, the distribution of the residual stress field of the box, the dimensional accuracy requirements, the working load, the possible failure causes and other factors are analyzed, and then the vibration aging is determined. The process line is timely and key.